簡析塔式起重機(jī)安裝及拆卸技術(shù)
簡析塔式起重機(jī)安裝及拆卸技術(shù)
摘要:文章主要講述了多層住宅九區(qū)塊第一期二標(biāo)段D33-D35,建筑市場(chǎng)的塔機(jī)采用固定式機(jī)型較多,而且安拆比較頻繁,在安裝拆卸過程中的危險(xiǎn)源很多如基礎(chǔ)、安裝場(chǎng)地、大件吊裝等,在安裝過程中的各個(gè)環(huán)節(jié)都要嚴(yán)格按照操作規(guī)程操作。著重談?wù)勊䴔C(jī)金屬結(jié)構(gòu)連接和頂升過程危險(xiǎn)源的控制。
關(guān)鍵詞:塔式起重機(jī) , 安裝 ,拆卸
Abstract: the paper mainly tells the story of multilayer residence nine blocks the first section of the D33-D35, tower in the construction market of fixed model is more, and Ann and frequently, in the installation process of the many hazards such as remove based, installation site, bulky hoisting and so on, in the installation process each link should be strictly follow operation procedures. Emphasize a talk tower structure connected and metal roof up process of hazard control.
Keywords: tower cranes, installation and removal
引言
塔機(jī)的金屬結(jié)構(gòu)連接一般有兩種方式.即高強(qiáng)度螺栓連接和銷軸連接。塔機(jī)高強(qiáng)度螺栓連接是靠摩擦力來傳遞結(jié)構(gòu)內(nèi)力的,要求連接面清潔,有較高的摩擦系數(shù)。擰緊力矩值非常重要,特別是預(yù)緊力矩。預(yù)緊的目的在于增強(qiáng)連接的可靠性和緊密性,以防止受載后連接件出現(xiàn)縫隙或發(fā)生相對(duì)滑移,以保證最終的安裝質(zhì)量。
1工程概況
多層住宅九區(qū)塊第一期二標(biāo)段D33-D35工程,位于某區(qū)路新生村, 建筑面積18706平方米,建筑最高度58米,十八層框剪結(jié)構(gòu),為解決施工垂直運(yùn)輸,根據(jù)施工現(xiàn)場(chǎng)情況,決定安裝一臺(tái)QTZ63型塔式起重機(jī)(以下簡稱塔機(jī))。根據(jù)現(xiàn)場(chǎng)場(chǎng)地情況,安排以下安拆方案。
2基礎(chǔ)定位及基礎(chǔ)施工