簡易聯(lián)體浮箱過江技術(shù)
簡易聯(lián)體浮箱過江技術(shù)
摘要:“過江”這一課題在水電施工中經(jīng)常出現(xiàn)。怎樣在最短時間內(nèi)將設備物資過江,全面打開施工作業(yè)面對水電項目起著決定性的作用。“水、陸、空”三路神仙也是各顯其能,水路使用船只過江;陸路架設橋梁過江;空路使用纜索吊運設備材料。三路中水路的施工成本最低,施工時間最短。本文著重對簡易聯(lián)體浮箱過江技術(shù)的施工工藝及注意事項進行了探討研究,旨在引導正確的施工方法,從而達到預期效果
關(guān)鍵詞: 聯(lián)體浮箱;過江;技術(shù)
Abstract: crossing the river, “the subject is often in hydropower construction. How equipment and materials in the shortest time to cross the river, to open a construction job to play a decisive role in the face of hydropower projects. The three gods of water, land and air is able to show by sea using boats to cross the river; land bridge across the river; by air using the ropes for lifting equipment and materials. Waterways in the three-way construction the lowest cost and shortest construction time. This paper focuses on the simple conjoined construction of the pontoon across the river process and precautions Investigative studies have been designed to guide the correct construction methods, so as to achieve the desired results
Key words: conjoined pontoon; crossing the river; technology
中圖分類號: TU761 文獻標識碼:A文章編號:
1、前言
“過江”這一課題在水電施工中經(jīng)常出現(xiàn)。怎樣在最短時間內(nèi)將設備物資過江,全面打開施工作業(yè)面對水電項目起著決定性的作用!八㈥、空”三路神仙也是各顯其能,水路使用船只過江;陸路架設橋梁過江;空路使用纜索吊運設備材料。三路中水路的施工成本最低,施工時間最短。所以本文就水路中的簡易聯(lián)體浮箱過江技術(shù)的相關(guān)問題結(jié)合工程實例作以介紹。
2、工程概況
雅礱江卡拉、楊房溝水電站交通專用公路VI 標段工程范圍為雅礱江左岸山坡上,現(xiàn)場只有前期勘探道路。主體工程樁號K41+300~K47+960,全長
6.66km,含草坪子特長隧道(長2437×2m,上下行)、七一橋隧道(長1177m)共2座隧道,和駱駝溝1號大橋(4×40m簡支變連續(xù)T梁橋)、駱駝溝2號大橋(1×40m簡支T梁橋)共2座橋梁,以及明線段。